How long does the BT team take to install a POS?From the signing of the contract, the BT POS team will install the terminal POS in maximum 3 days and will train the staff whenever needed. Last update2026-06-12Was the answer useful to you? 0 How can we improve the answer? We are sorry that this answer was not useful to you. Help us improve it0/500Send feedback 21 TagPOS