How long does the BT team take to install a POS?
From the signing of the contract, the BT POS team will install the terminal POS in maximum 3 days and will train the staff whenever needed.
Last update
From the signing of the contract, the BT POS team will install the terminal POS in maximum 3 days and will train the staff whenever needed.
